Duraflex - the original flexible moulding

INSTALLATION TIPS

If you have a question we don't address,
please call or eMail us today:
   ResinArt East: 800-497-4376
   ResinArt West: 800-258-8820

CHECK OUT OUR NEW RADIUS CALCULATOR.

Installation Instructions

The following are procedures and instructions for the installations of DuraFlex and XtraFlex Mouldings.

Fastening
For best results, the use of construction type adhesive in addition to pneumatic pin nailing is recommended. Use of tape or clamps may be helpful in securing material in position while adhesives bond. Nails should be kept to a minimum and 3/8" from any edge.

Cutting
Material can be cut, shaped and sanded using standard woodworking equipment. Note that the wood grain on Stain grade material is only on the surface and will be eliminated if sanded.

Stain
The use of water based stain such as Minwax works well. Apply with brush or rag and wipe off. Additional coats may be applied if necessary to match wood. Be sure to allow first coat to dry completely before applying more stain. Finish with clear coat after staining.

Paint
All paints work well. Best results are seen when a primer coat is applied. When using Alkyd Enamels or Oil based Enamels a water base or Latex undercoat is required. Never paint before installation. The material is flexible and the paint may crack during installation.

Installation Tips - Half Round and Arcs

  1. Check thickness of product to thickness of matching wood where DuraFlex Moulding and the wood moulding will meet. It may be necessary to shim or plane off either product to have material properly line-up.
  2. Align radium product to window.
  3. Support DuraFlex Moulding by tacking in place to see proper alignment.
  4. Nail first at top of arch and work toward ends.

Installation Tips - Crown Mouldings

  1. Check thickness of DuraFlex Moulding to thickness of any other product being butted against it. May be necessary to shim or plane-off either product to have material properly line-up.
  2. Support DuraFlex Moulding in position to check proper fit.
  3. Pre-drill nail and screw holes.
  4. Fasten nails and screws into cleating on wall.
  5. Use drywall screws for large crowns along with adhesive.
  6. All crowns are made to a specified radius. Do not compress or stretch material - cracking may occur.

Installation Using GEL Super Glues Installation Using GEL Super Glues

Apply bead of adhesive where moulding bonds to wallboard and another bead where moulding bonds to jamb or window (see picture A). Put into position and hold firmly until adhesive sets (approx. 2 minutes). Increase the cure rate to 5 - 10 seconds by spraying accelerator at edge between moulding and wallboard (see picture B).

By using the GEL Super Glues nailing and nail holes are eliminated.


Navigation Bar

ResinArt - West
1621 Placentia Ave.
Costa Mesa, CA 92627
gary@resinart.com
Phone: 800-258-8820
FAX: 949-642-6519

ResinArt Logo
RETURN TO THE HOME PAGE

ResinArt
Copyright © 2008. All Rights Reserved.

ResinArt - East
201 Old Airport Road
Fletcher, NC 28732
tom@resinart.com
Phone: 800-497-4376
FAX: 828-687-0182